PLANT DE-BOTTLENECKING - PARTIAL CLIENT LIST

Sr No

Client

Improvement

1

Armour Polymer Ltd

Pyridine & Cyanopyridine Plant Audit to increase distillation performance, reduce energy consumption and reduce waste generation. Schemes were developed having payback periods of 4-20 months

2

Avani Petrochem Ltd., Halol

Naphtha / Kerosene Distillation System Improvement to recover 20 to 30°C cuts as solvents.

3

Bharat Rasayan Ltd., Delhi

Revamping of MBB distillation system to increase capacity by 37%, purity from 94 to 98.5 %.

4

Clarisis Organics Ltd., Vadodara.

Increasing capacity of the ODCB column.

5

Clarisis Organics Ltd., Vadodara.

Study on MCB & NB plant improvement. Necessary recommendations were suggested to reduce the NB reaction batch time, Improvement in the recovery of nitrobenzene, Reduction of benzene carry over, Improvement in the performance of distillation columns etc.

6

Colourcraft

Ceramic Colour Modernisation Project

7

Diamines and Chemicals Ltd., Vadodara

Increased distillation capacity of Ethylene Amines by 50 %

8

Diamines and Chemicals Ltd., Vadodara

Optimised separation of Higher Amines to increase capacity by 25 % and reduce energy consumption by 20 %

9

Duncans Industries Ltd

Syngas chilling at compressor suction for Ammonia Plant to reduce power saving by 255 KW i.e. 8 % of existing power consumption in the compressors

10

GEMCO International (The Netherlands )

Process Audit of Ammonia, Urea, Phosphoric Acid, Ammonium Sulphate & DAP plants of G.S.F.C to reduce pollution (waste water treatment) and improve energy efficiency.

11

GEMCO International (The Netherlands )

Process Audit of Ammonia and urea plants of Duncans-Kanpur, NFL-Nangal, FACT-Cochin, FCI-Sindri

12

GEMCO International (The Netherlands )

Various schemes were developed to improve energy efficiency having 6-30 months of payback period.

13

Gujarat Heavy Chemical Ltd., Veraval

Installation of Ammonia Gas detector and water curtain to contain ammonia leakage

14

Indu-Nissan Oxo Chemical Inds. Ltd., Vadodara

Simulation study of Syngas preheating system. Necessary recommendations were suggested to increase the temperature of feed natural gas.

15

Indu-Nissan Oxo Chemical Inds. Ltd., Vadodara

Troubleshooting of Oxo Alcohol Purification section. Necessary recommendations were suggested to reduce the concentration of alcohol from 25 to 1.5 % at the bottom by reducing pressure from 67 to 26 mm Hg a.

16

Kamal Organics Ltd., Mumbai

Increased distillation capacity by about 100 % by debottlenecking

17

Reliance Industries Ltd., Hazira

Installation of steam heated reboiler parallel to thermic fluid heated reboiler

18

Simalin Chemical Inds. Ltd., Vadodara

Technical support to the Formaldehyde / Hexamine plants.

19

United Phosphorus Limited

Improvement in Isocynate Plant

20.

United Phosphorus Limited

Continuous Crystallizer for Acephate Plant

21
United Phosphorus Limited Ammonium Chloride Filtration Unit

 

 
   